The cost of electricity for any manufacturing unit in Oman depends not only on the quantity of electricity consumed, but also on the time of electricity consumption. Electricity is expensive during peak hours, which affects the monthly bill of such units to a great extent. 

The owners of factories often do not know how much they have been paying for these peak hours until they see the final bill at the end of the year.

This problem is reduced with the help of industrial solar panels, which produce electricity during the day when there is maximum consumption of electricity in the factory units. 

At Siraj Solar, the solar panels are designed to match your plant’s exact power needs. We help you to offset your rush hour charges by making the most of cheap solar power.

Table of Contents

  • How do time-of-use electricity tariffs affect industrial energy costs in Oman? 
  • How is a solar system sized to match a factory’s peak power consumption? 
  • How do businesses measure and verify actual rush-hour savings after installing solar? 

How do time-of-use electricity tariffs affect industrial energy costs in Oman? 

High tariff system for big factories

In Oman, cost-reflective tariffs are used for large-scale factories and industrial firms that consume much energy. This means that the electricity tariff is based on the true cost of production and delivery of electricity to consumers.

The price of electricity changes with the time of use

The electricity prices change depending on when it is consumed. As a result, industries pay a higher electricity price used during peak hours and a lower price during off-peak hours.

Extra charges during rush hours

Not only the cost of electricity but also additional charges for using a large amount of electricity during peak hours must be paid by factories.

Prices change with the seasons

Electricity costs may be higher in the summer months than in other months. In Oman, electricity prices will likely increase during the summer months as demand increases significantly due to the cooling systems used.

There are a few things in the bill

In the electricity bill, the industry does not have only the cost of the electricity. There are various kinds of expenses, which include transmission fees of electricity through wire or pipeline from the source to the industry.

How is a solar system sized to match a factory’s peak power consumption? 

Solar systems in factories are sized with real data. First of all, an analysis of 12-month electricity bills to determine the consumption and the busiest hours. Then the engineers construct a load profile. It shows the exact time the factory consumes the most energy, i.e., during working hours. 

This peak load (kW) is used to determine the amount of solar energy needed to cut costs during the busiest hours. The space for placing the equipment, the usage of machines that consume sudden power, and future growth are considered. 

Further batteries can be added in case the factory runs till late evening hours and needs additional energy. Siraj Solar takes care of end-to-end solar installation and maintenance, too. 

How do businesses measure and verify actual rush-hour savings after installing solar? 

To verify the savings that businesses have made from the installation of solar, it entails checking the electricity bills before and after the installation of solar power, but focusing on the cost of peak hours as opposed to the overall electricity bill. 

Most of the solar panel systems have monitoring software that tells the real-time power consumption, which will help in knowing exactly how many kilowatt-hours of power were consumed in the expensive hours by the solar system as opposed to the grid system.  This will be checked with the factory’s usual pattern of power consumption. 

Many providers, including us, put out monthly updates detailing the savings they have achieved. The bill will also show savings on the peak demand (kW) charge. 

Conclusion

Wondering how much your plant could save at peak times? Contact Siraj Solar for a full power study and design a solar energy solution that is custom-designed with our certified solar engineers to fit your specific plant needs. 

FAQs

  1. Do I need batteries to reduce peak-hour charges?
    Not necessarily. If your factory’s busiest hours are during the day, solar energy may be sufficient. Battery systems would help you save more in case you work till late evenings.

  2. How do I determine the right size of the solar system for my factory?
    Our engineers size the system based on your historical electric bills, usage pattern and technical details about your facility.

  3. How do I get started with Siraj Solar?
    You just have to contact us for a free discussion. We will assess the electricity needs of your factory and suggest a solar solution to help you cut your high-demand hour charges.
Facebook
Twitter
LinkedIn
WhatsApp
Picture of Siraj_Super_Admin
Siraj_Super_Admin

Leave a Reply

Your email address will not be published. Required fields are marked *

20 + 20 =